top of page

Ask for Help!

Public·90 members

Sum mix pan cal

Hi,


With cal where do I measure 0v?


Thanks.

Richard


PAN OFFSET - Turn pan of channel X to the left adjust OFS_PAN_XL to zero volts - Turn pan of the channel to the right, adjust

OFS_PAN_XR to zero volts - Repeat for the other channel

137 Views
Richard Thornton
Richard Thornton
Jul 13, 2025

Thanks Stefan, is calibration always required?


So I use a 2ch oscilloscope.


Is there a systematic process, if I see over 0v how do I figure out which of the 12 trimmers to trim?


I sort of imagined the measurement might have been taken on the corresponding VCA IC?

Edited
bottom of page